Four new storage tanks have been constructed at Trans Mountain’s Edmonton terminal to prepare for opening of the oil pipeline expansion from Alberta to Westridge Terminal in Burnaby B.C. (Trans Mountain)

Four new storage tanks have been constructed at Trans Mountain’s Edmonton terminal to prepare for opening of the oil pipeline expansion from Alberta to Westridge Terminal in Burnaby B.C. (Trans Mountain)

Trans Mountain begins laying Alberta pipeline for expansion

Construction continues at Westridge terminal in Burnaby B.C.

Trans Mountain Corp. has begun laying pipe across the Alberta segment of its oil pipeline twinning project, expecting to have the first pipe welded, tested and buried by Christmas.

Construction so far has included completion of four new storage tanks at the federal government-owned company’s Edmonton Terminal, and continued work on the Westridge Terminal facilities at Burnaby to accommodate additional tankers for exporting crude.

Pipe is being assembled on the Greater Edmonton section, with clearing, grading, utility relocation and worksite preparations for a series of tunnel-bored sections. Horizontal drilling is planned for 13 sections on the Alberta side of the project, to cross watercourses, railways, major roads, sensitive environmental areas and urban areas, Trans Mountain said in its latest project update.

Trenchless construction is also expected to play a large role in the B.C. section of the project, where thousands of property owners have moved in along the right-of-way since the original Trans Mountain was built in 1954.

Trenchless construction is also expected to play a large role in the B.C. section of the project, where thousands of property owners have moved in along the right-of-way since the original Trans Mountain was built in 1954 to supply refineries at Burnaby and Washington state as well as tanker exports from Burnaby.

RELATED: CEO promises ‘the best darn pipeline in the world’

RELATED: Indigenous leaders choose pipelines over poverty

RELATED: Oil-by-rail traffic rises as B.C. battles Trans Mountain

The B.C. government has continued to oppose the Trans Mountain expansion, supported by Washington Gov. Jay Inslee, despite increased crude by rail coming through Alberta and B.C. to Washington since the existing Trans Mountain line became over-subscribed.

In a year-end interview with Black Press, B.C. Premier John Horgan acknowledged that construction is likely to intensify an already acute shortage of skilled construction workers, as work camps and gas pipeline spreads take shape across northern B.C. to supply the LNG Canada project from Dawson Creek to Kitimat.

B.C. is using a union-only construction model to build the Kicking Horse Pass and other sections of the Trans-Canada Highway from Kamloops to the Alberta border, as well as replacing the Pattullo Bridge and building the Broadway subway line in Metro Vancouver. A skilled labour shortage is driving up costs on those projects, Horgan said.

“And at the same time we have private sector projects like LNG Canada, and potentially the Trans Mountain pipeline, that are going to be taking a whole bunch of workers out of play when it comes to public contracts, and that’s a challenge for government,” Horgan said.

From the Greater Edmonton section, the Trans Mountain right of way goes to Edson, Hinton, Spruce Grove, Stony Plain and Wabamun before reaching the Jasper-Mount Robson stretch where twinning was done a decade ago.

Entering B.C. in the North Thompson region, the pipeline route goes by Avola, Barriere, Blue River, Clearwater, Valemount and Vavenby, where the forest industry has been wound down due to market conditions and loss of lumber to beetle infestations and fires.

At West Barriere, another existing expansion section will be tested and activated, running from a pump station north of Barriere to a new Black Pines pump station north of Kamloops. From there the project goes past Kamloops and Merritt, then down the Coquihalla Pass to Hope.

The project proceeds down theFraser Valley through Chilliwack, Abbotsford and Langley, then into the heavily populated Lower Mainland through Langley, Surrey, Coquitlam and Burnaby.


@tomfletcherbc
tfletcher@blackpress.ca

Like us on Facebook and follow us on Twitter.

BC legislatureTrans Mountain pipeline

Just Posted

A screenshot of the First Peoples Cultural Councils First Peoples’ Map. (First Peoples Cultural Council)
Online resource blends B.C.’s Indigenous language, art and culture

North Saanich advisor says initiative supports urgent need to preserve Indigenous languages

General manager Lindsey Pomper says Sidney’s Star Cinema cannot wait welcome audiences when it reopens June 18, amid an easing of public health measures. (Wolf Depner/News Staff)
Sidney’s Star Cinema raises curtain for the first time after months in the darkness

Iconic theatre to reopen at half capacity for Friday night showing

A dogs in parks pilot study unanimously approved by Saanich council will evaluate how park space can best be shared between dog owners and non-owners alike. (Photo by Megan Atkins-Baker/News Staff)
Saanich to study park-sharing strategy between those with and without pets

District-wide People, Parks and Dogs study to produce recommendations by fall

Staff member Lena Laitinen gives the wall at BoulderHouse a workout during a media tour on June 16. (Rick Stiebel/News Staff)
BoulderHouse raring to rock Langford

Popularity of bouldering continues to climb across Greater Victoria

The Sooke Potholes is a jewel in the community's crown. Transition Sooke hosts a town hall meeting on community growth on June 26. (Courtesy: Sooke News Mirror)
Sooke forum tackles community growth

To Grow or Not to Grow online town hall meeting set for June 26

Maxwell Johnson is seen in Bella Bella, B.C., in an undated photo. The Indigenous man from British Columbia has filed complaints with the B.C. Human Rights Tribunal and the Canadian Human Rights Commission after he and his granddaughter were handcuffed when they tried to open a bank account. THE CANADIAN PRESS/HO-Heiltsuk Nation, Damien Gillis, *MANDATORY CREDIT*
VIDEO: Chiefs join human rights case of Indigenous man handcuffed by police in B.C. bank

Maxwell Johnson said he wants change, not just words, from Vancouver police

(Black Press Media file photo)
POLL: When was the last time you visited the mainland?

The films are again lighting the screens at local theatres, the wine… Continue reading

Anyone with information on any of these individuals is asked to call 1-800-222-TIPS (8477) or visit the website victoriacrimestoppers.ca for more information.
Greater Victoria Crime Stoppers wanted list for the week of June 15

Greater Victoria Crime Stoppers is seeking the public’s help in locating the… Continue reading

Tk’emlups te Secwepemc Chief Rosanne Casimir stands outside the former Kamloops Indian Residential School after speaking to reporters, in Kamloops, B.C., on Friday, June 4, 2021.THE CANADIAN PRESS/Darryl Dyck
Kamloops chief says more unmarked graves will be found across Canada

Chief Rosanne Casimir told a virtual news conference the nation expects to release a report at the end of June

A woman wears a vaccinated sticker after receiving a COVID-19 vaccine at a vaccination clinic run by Vancouver Coastal Health, in Richmond, B.C., Saturday, April 10, 2021. THE CANADIAN PRESS/Jonathan Hayward
B.C. ranks among highest in world in COVID-19 first-dose shots: health officials

More than 76% of eligible people have received their 1st shot

An artists conception of the new terminal building at the Pitt Meadows Regional Airport.
Air travel taking off in B.C., but lack of traffic controllers a sky-high concern

There will be demand for more air traffic controllers: Miller

Canadian Armed Forces experts are on their way to North Vancouver after a local homeowner expressed worry about a military artifact he recently purchased. (Twitter DNV Fire and Rescue)
Military called in to deal with antique ‘shell’ at North Vancouver home

‘The person somehow purchased a bombshell innocently believing it was an out-of-commission military artifact’

Amy Kobelt and Tony Cruz have set their wedding date for February, hoping that more COVID-19 restrictions will have lifted. (The Macleans)
B.C. couples ‘gambling’ on whether COVID rules will let them dance at their wedding

Amy Kobelt and Tony Cruz pushed back their wedding in hopes of being able to celebrate it without the constraints of COVID-19

A plane is silhouetted as it takes off from Vancouver International Airport in Richmond, B.C., May 13, 2019. THE CANADIAN PRESS/Jonathan Hayward
Report calls for airlines to refund passengers for flights halted due to COVID-19

Conclusion: federal help should be on the condition airlines immediately refund Canadian travellers

Most Read