Coastal GasLink stops work on section of pipeline route

Internal audit reveals clearing took place without valid archaeological impact assessments in place

Map of pipeline route showing location of Section 8 on which work has been stopped due to discrepancies with archaeological impact assessments. Coastal GasLink graphic.

Coastal GasLink (CGL) has stopped work on the last section of its pipeline project which runs from roughly south of Hazelton to Kitimat due to discrepencies with its archaelogical impact assessments.

In a statement on its website tonight, the company said it had discovered during an internal audit two areas where clearing has taken place in Section 8 contrary to its permits from the BC Oil and Gas Commission (OGC).

“At KP (kilometre post) 585, an area of approximately 600 metres long by 50 metres wide was cleared without an approved AIA in place,” the statement reads. “Areas adjacent to this location did have an approved AIA and were identified as low likelihood of archaeological significance. While clearing activities have taken place, minimal ground disturbance has occurred since the area has been used for transit and corduroy mats had been placed to limit disturbance.

READ MORE: NEB rejects federal review of Coastal GasLink pipeline

“At KP 631, due to a re-route, an area of approximately 240 metres by 10 metres was cleared without an AIA being completed. Areas adjacent to this location did have an approved AIA and were identified as low likelihood of archaeological significance”

CGL says it has voluntarily disclosed these incidents to (OGC), and the Environmental Assessment Office (EAO) and First Nations groups affected.

“Coastal GasLink is committed to protecting the environmental and cultural values of British Columbia during construction and operation of our natural gas pipeline,” said David Pfieffer, CGL president.

READ MORE: Gidimt’en launch civil lawsuit against Coastal GasLink

“Coastal GasLink regrets the errors that led to construction activities taking place without having approved archaeological impact assessments in place prior to start of construction.

“I have directed the team to complete a thorough investigation of these incidents and have halted clearing work in the area until the investigation is complete and recommendations are put into practice.

“I have also apologized to the impacted Indigenous communities and requested their participation in a proposed post-impact assessment.”



editor@interior-news.com

Like us on Facebook and follow us on Twitter

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Police incident in Mount Douglas Park leads to road closure

Officers turning cars away, letting hikers go up trails

PHOTOS: Women’s March through downtown Victoria draws crowds of activists, allies

Attendees of all ages carried instruments, posters with empowering messages

Victoria resident lives well despite dementia

Walter Strauss has developed an interest in music and now takes line dancing classes

New Oak Bay bylaw supports planting 5,000 new trees

Residents can share thoughts on new tree protection bylaw at Jan. 29 open house

‘Like an ATM’: World’s first biometric opioid-dispensing machine launches in B.C.

First-of-its-kind dispensing machine unveiled in the Downtown Eastside with hopes of curbing overdose deaths

Canucks extend home win streak to 8 with 4-1 triumph over Sharks

Victory lifts Vancouver into top spot in NHL’s Pacific Division

BC Green Party leader visits northern B.C. pipeline protest site

Adam Olsen calls for better relationship between Canada, British Columbia and First Nations

B.C. society calls out conservation officer after dropping off bear cub covered in ice

Ice can be seen in video matted into emaciated bear cub’s fur

Horgan cancels event in northern B.C. due to security concerns, says Fraser Lake mayor

The premier will still be visiting the city, but the location and day will not be made public

PHOTOS: Eastern Newfoundland reeling, search underway for missing man after blizzard

More than 70 centimetres of new snow fell overnight, creating whiteout conditions

Prince Harry, Meghan to give up ‘royal highness’ titles

‘Harry, Meghan and Archie will always be much loved members of my family,’ says Queen Elizabeth II

Ice chunk from truck crushes vehicle windshield on Vancouver Island

None injured, but Nanaimo RCMP say there can be fines for accumulations of ice and snow

Calls for dialogue as Coastal GasLink pipeline polarizes some in northern B.C.

Coastal GasLink is building the 670-kilometre pipeline from British Columbia’s northeast to Kitimat on the coast

Most Read