A rendering of the four hybrid-electric Island Class vessels that will join the BC Ferries fleet in 2022. (Courtesy of BC Ferries)

BC Ferries budgets $200M to add four more hybrid-electric vessels to fleet

Vessels expected to arrive in 2022

BC Ferries has plans to add four more hybrid-electric ships to its fleet.

A contract has been awarded to Netherlands based Damen Shipyards Group to build four more battery hybrid-electric Island Class vessels scheduled to go into service in 2022. In the spring of 2017, BC Ferries gave the same company contracts to build two of the hybrid-electric vessels which have successfully completed sea trials and are expected to arrive in Victoria by January 2020.

Damen Shipyards Group will also extend its agreement with Point Hope Shipyards in Victoria to provide technical and warranty support for the new vessels with their local staff.

“Our Clean Futures Plan spells out our strategy to reduce GHG emissions by replacing our legacy carbon intensive fossil fuelled vessels with ships using clean energy,” said Captain Jamie Marshall, vice president of business development and innovation with BC Ferries, in a statement. “These next four Island Class ships are a major step in our plan to progressively lower emissions across the fleet and be a leader in the energy transition to a lower carbon future.”

READ ALSO: BC Ferries invites Greta Thunberg to tour new ‘clean’ ferries

The Island Class vessel is a battery-powered ferry and when electric charging technology becomes advanced enough to make electricity available in the quantities needed, BC Ferries said it will operate the new ships as completely electric ferries using clean energy. In the meantime, the ships will use an on-board, low sulphur, diesel hybrid system.

BC Ferries said the agreement with Damen Shipyards Group is a design-build, fixed-price contract giving BC Ferries guarantees when it comes to delivery dates, performance criteria, cost certainty and quality of construction. According to BC Ferries, the total budget for the project is about $200 million.

The first two Island Class ships will be seen on the Powell River-Texada Island route and the Port McNeill-Alert Bay-Sointula Island route by mid-2020.

The third and fourth vessels will service the Campbell River-Quadra Island route and the last two will serve the Nanaimo Harbour-Gabriola Island route by 2022.

READ ALSO: Hybrid vessels part of B.C. Ferries’ plans to reduce emissions

BC Ferries said replacing one larger ship with two smaller vessels will give customers more frequent service, increased passenger capacity per hour, reduced vehicle line-ups, improved safety and reduced congestion on local roads. The vessels will have the capacity to carry at least 47 vehicles and up to 300 to 450 passengers and crew depending on configuration.

Some highlights of the vessels besides the electric power and battery-hybrid power are that the exhaust system reduces Nitrogen oxide emissions, twin propellers on the ships are designed to reduce underwater radiated noise, they’re designed to be fully accessible without elevators to reduce energy consumption, they are completely outfitted with LED lights, the heat recovery system uses waste thermal energy to heat the vessel and they offer comfortable passenger lounges and solariums.

In 2018, BC Ferries issued a request for expressions of interest to construct the four latest vessels. Eighteen responses were received from international shipyards which were short-listed to 9. No Canadian companies submitted a bid.

Damen Shipyards Group operates 36 shipbuilding and repair yards around with world with 12,000 employees. The company delivers about 175 vessels annually worldwide.

shalu.mehta@goldstreamgazette.com


Like us on Facebook and follow us on Twitter

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Recent arrests skim surface of Victoria’s human trafficking problem

Port city makes desirable place for traffickers flying under the radar

Two-vehicle crash in Langford sends one to hospital Monday morning

Driver sent to hospital with unspecified injuries

Victoria Canadian Forces member honored with exceptional Rotary Club award

Capt. Jacqueline Zweng is the Western Canada Ambassador of Wounded Warriors Canada

Oak Bay athletes rule the slopes at Island ski and snowboard series

Oak Bay boys take top ski, snowboard honours

B.C. budget expected to stay the course as economic growth moderates

Finance minister said ICBC costs have affected budget

VIDEO: Ottawa wants quick, peaceful resolution to pipeline protests, Trudeau says

The protests have manifested themselves as blockades on different rail lines across the country

New highway proposed between Alberta and B.C.

The route would connect Red Deer to Kamloops

Wet’suwet’en and B.C. government have been talking Aboriginal title for a year

Coastal GasLink says it has agreements with all 20 elected First Nations councils along the 670-kilometre route

Trudeau tightlipped on plan to end protests ‘quickly and peacefully’

The prime minister, who cancelled a two-day trip to Barbados this week to deal with the crisis at home

Canadian standards for coronavirus protection to be reviewed, health agency says

The protocols set out how health workers should protect themselves and their patients

Monday marks one-year anniversary of man missing from Langley

42-year-old B.C. man, Searl Smith, was last seen leaving Langley Memorial Hospital on Feb. 17, 2019

Amtrak warns of delays as railways from Seattle to B.C. blocked by Wet’suwet’en supporters

Coastal GasLink said it’s signed benefits agreements with all 20 elected band councils along pipeline route

Federal emergency group meets on pipeline protests as rail blockades continue

There’s mounting political pressure for Trudeau to put an end to the blockades

VIDEO: Minister reports ‘modest progress’ after blockade talks with First Nation

Wet’suwet’en hereditary chiefs say Coastal GasLink does not have authority to go through their lands

Most Read